Project 18025: very long calc time (multiple days)

Moderators: Site Moderators, FAHC Science Team

Post Reply
ludi_cosman
Posts: 2
Joined: Tue Feb 09, 2021 10:37 pm

Project 18025: very long calc time (multiple days)

Post by ludi_cosman »

At the moment two WUs of project 18025 are now being processed on one of my computers with two graphic cards. But these WUs take considerable more time than normal. Normally I see multiple WUs being finished per day, but now these take multiple days. Eg. the WU 18025 (64, 2, 265) running on a RX 5700 is now at 25.83% and the ETA is 2.51 days . The other WU 18025 (53, 1, 225) is running on a RX 580 is at 70.65% with an ETA of 23 hours and 45 minutes.
Anyone else observing this?
aetch
Posts: 447
Joined: Thu Jun 25, 2020 3:04 pm
Location: Between chair and keyboard

Re: Project 18025: very long calc time (multiple days)

Post by aetch »

I would suggest pausing all work units, wait a minute, reboot your computer and restart folding.

My thinking is that your computer has installed some update in the background which as interrupted the flow of the folding cores.
Folding Rigs - None (25-Jun-2022)

ImageImage
ludi_cosman
Posts: 2
Joined: Tue Feb 09, 2021 10:37 pm

Re: Project 18025: very long calc time (multiple days)

Post by ludi_cosman »

I rebooted my computer and it helped it's now going much faster. thanks for the tip!